PXB100B
90L-120L Blow Molding Machine
- Double Drawbar clamping mechanism
- Perfect Usage for Chemical Drum, Road barrier, ABS car bumper
- High clamping force with short production cycle
- Patented Technology Die head system
- Optional Transparent line
Configuration List
PLC |
MITSUBISHI |
Japan |
Touch Screen |
HITECH |
Taiwan |
Inverter |
MITSUBISHI |
Japan |
Power Supply |
MEAN WELL |
Taiwan |
Relay |
OMRON |
Japan |
Hydraulic Valves |
YUKEN |
Japan |
Hydraulic Pump |
YUKEN |
Japan |
Contactors |
LS(LG) |
Korea |
Solid relay |
FOTEK |
Japan |
Breaker |
LS(LG) |
Korea |
Temperature Control Module |
MITSUBISHI |
Japan |
Oil Sealing |
DZ |
Taiwan |
Oil Tube |
LIEBAO |
Taiwan |
Transducer |
GEFRAN |
Italy |
Proximity Switch |
SONON |
China |
Motor |
SIEMENS |
China |
Air Valve |
FESTO |
Germany |
Parison Controller |
Moog |
Japan |
Servo Valve |
Moog |
Japan |
Parameters:
Material |
|
PE,PP,ABS... |
Max container capacity |
L |
120 |
Output(dry cycle) |
pc/hr |
320 |
Machine dimension(L×W×H) |
M |
6.2×2.8×4.6 |
Machine weight |
T |
15 |
Clamping Unit |
|
|
Clamping force |
kn |
450 |
Mold platen size(W×H) |
mm |
1200×1200 |
Platen opening stroke |
mm |
600-1400 |
Platen moving stroke |
mm |
700 |
Max mold size(W×H) |
mm |
900×1400 |
Mold thickness |
mm |
510-650 |
Power |
|
|
Servo oil pump motor power |
KW |
18.5 |
Servo pump displacement |
L/MIN |
120 |
Blow pressure |
MPA |
1 |
Air consumption |
M3/MIN |
1.8 |
Cooling water pressure |
mpa |
0.4 |
Water consumption |
L/min |
180 |
Average energy consumption |
KW |
52-60 |
Extruder unit |
|
|
Screw diameter |
mm |
100 |
Screw L/D ratio |
L/D |
24 |
HDPE Melting capacit for HDPE |
kg/hr |
160-200 |
Number of heating zone |
zone |
5 |
Screw heating power |
kw |
25.1 |
Screw fan power |
KW |
0.6 |
Extruder motor power |
kw |
55 |
Die head |
|
|
Number of heating zone for single die head |
zone |
5 |
Heating power for single die head |
kw |
26 |
Max die-pin diameter |
mm |
450 |
Accumulator capacity |
L |
12(15) |
(HDPE) Accumulator weight(HDPE) |
KG |
9(11) |
Delivery Time:
- No later than 65 days after receipt of the deposit
Training:
- We provide training service for two or three operating men for free (but the cost for trainer's board and lodging is not included).
Installation:
- The supplier will send one specialist to test run the machine until it is running in normal state.
Guarantee:
- Our guarantee is valid for a period of 12 months. If the malfunction caused of the machine's self quality, we will troubleshoot it for free.
Auxiliary Equipments:
- Auxiliary equipments for production line are available and optional, please kindly ask for quotation.